54 FOGHORN REGULATORY REPORT crew who’ll operate them make for a smoother transition from shipyard to operations. That engagement reveals early whether the as-built boat is di- verging from the plans and standards, weights and centers, weld quality, materials, and pipe sizing, and lets questions like embarkation flow or docking-slip access get answered while a change is still cheap. Building in sea trials and familiarization time, not just acceptance testing, also lets crews start drafting SMS procedures around the vessel’s real configuration instead of a generic template. Machinery monitoring built in from day one. Condition-based maintenance depends on the right sen- sors and data feeds, and that’s a speci- fication decision, not an afterthought. Engine, gearbox, and generator mon- itoring, vibration and temperature trending, run-hour and fuel logging, are all far cheaper to build in than to retrofit later. Operators should specify exactly what data their SMS software needs from day one, so the vessel starts her service life with real operating data instead of a blank maintenance log. Change management during the build. Construction projects evolve, designs change, equipment is substi- tuted, and schedules compress. Each carries the same operational risk an SMS is built to manage and applying that same change-control mindset to the build, not treating change orders as purely commercial, keeps safety from falling through the cracks of a compressed schedule. Closing the loop from operations back to design. This is where the con- nection matters most. This isn’t really a chicken-or-egg question: operations and design aren’t competing for which comes first, each one is supposed to feed the other. If there’s a floor under everything else here, it’s this: at an absolute minimum, lessons learned in service should shape the design of what comes next. An SMS generates exactly the data a designer needs and rarely gets: near-miss reports, maintenance trends, crew feedback, and root causes. This data tends to stay in the operator’s SMS records and never reaches the yards de- signing the next vessel. Operators build- ing or converting have real leverage to insist on the reverse flow: feeding SMS lessons into the specs for the next hull instead of starting from a clean sheet. The familiar plan-do-check-act cycle shouldn’t stop at the wheelhouse door; it should widen to take in the shipyard too, as shown below. Wendella Tours & Cruises’ experi- ence on the Chicago River illustrates this well. Tight turns, heavy traffic, and current mean close-quarters near misses are a recurring, well-document- ed hazard in the fleet’s SMS reporting. Rather than logging each one and moving on, that pattern became an in- put into propulsion and maneuvering specs for newer vessels, with improved stopping performance built in as a di- rect response. That’s the loop working as intended: a hazard that shows up repeatedly in operations gets carried forward as a design requirement, not just a training talking point, and the next vessel is measurably safer for it. WHY THIS MATTERS NOW With America’s growing interest in domestic shipbuilding capacity and quality, PVA members are well posi- tioned to lead by example. Bringing SMS thinking to the shipyard doesn’t just produce a better vessel, it shows the shipyard, the Coast Guard, and insur- ers that safety isn’t a program switched on at delivery. It’s a continuous thread from concept to keel to operations, for the vessel’s entire service life and for whatever comes after her. The question worth asking at every stage of a con- struction project isn’t just “does this meet the requirement,” but “how will this be operated and improved once she’s in service, and what do we owe the next design because of it?” That’s the SMS question, and it belongs in the shipyard as much as the wheelhouse. ACT (revise the design or spec) DO (build) ACT (make it better) DO (run the SMS) CHECK (inspect, sea trials, as-built review) Lessons learned from operations become the spec for the next boat or refit CHECK (audits, near-miss data) PLAN (spec the newbuild or refit) PLAN (operations) EXTENDING THE PDCA LOOP FROM VESSEL OPERATIONS INTO THE SHIPYARD
View this content as a flipbook by clicking here.